Overview
An owner-operator video that starts as a subsoiler how-to, explaining why breaking compaction beats grading, measuring shank depth at 21 inches, and spacing rows 30 inches apart, but turns into an unplanned breakdown story when rocks mangle the implement's arms. The back half covers field repairs, torch work, and a failed straightening attempt. Most useful for anyone weighing subsoiler limitations on rocky ground.
An owner-operator channel where the creator documents real work on his own property, including unfiltered setbacks.
